Your first-hand experiences really help other travelers. Thank

Infrastructure | Tổng công ty Tín Nghĩa - Ban Quản lý Các khu công nghiệp Tín Nghĩa
Top » Industrial parks » An Phuoc IP
Infrastructure

Traffic system

- Internal roads with asphalted and designed according to Vietnam Standard with loading capacity H30, the width 20m to 40m, meeting need of heavy capacity container transportation.
- All areas in the I.P are connected with internal traffic road system, ensuring for convenient internal transportation.

 


Power supply

- Supplied from the national grid of 22 KV.
+ Regular-time hour: 1,453 VND/Kwh
(From Monday to Saturday: 4h – 9h30;
11h30–17h; 20h – 22h; Sunday: 4h – 22h).
+ Low-time hour: 934 VND/Kwh
(From Monday to Sunday: 22h – 4h).
+ Peak-time hour: 2,637 VND/Kwh
(From Monday to Saturday: 9h30 – 11h30; 17h – 20h; Sunday: no peak hour).


Water supply

- The supplied water is ensure for the demand of producing and living of the investors.
Nhon Trach underground water plant: with capacity of 10,000m3/day & night.
+ Water using fee: 11,500 VND/m3



Telecommunication system

With telecommunication services of VNPT, FPT, Viettel…will meet investors’ requirements in the I.P. Parameters of the internet line speed:
- ADSL: max 8 MB/s.
- Fiber optic cable: max 90MB/s.


Waste water treatment

- Designing capacity: 6,000m3/day, night (phase 1 2,000m3/day & night)
- Standard level for effluent discharged into waste water system of the I.P.: according to QCVN 40:2011.
- Waste water treatment fee: 0.32 USD/m3 (excluding VAT)
- The amount of waste water equal to 80% supplied clean water.