Infrastructure

Internal transport system

- Traffic systems connected to the main roads in the region.


Power supply

Electricity supply: (excluding VAT)
- Supplied from the national grid of 22 KV.
+ Regular-time hour: 1,405 VND/Kwh (From Monday to Saturday: 4h – 9h30; 11h30–17h; 20h – 22h; Sunday: 4h – 22h).
+ Low-time hour: 902 VND/Kwh (From Monday to Sunday: 22h – 4h).
+ Peak-time hour: 2,556 VND/Kwh (From Monday to Saturday: 9h30 – 11h30; 17h – 20h; Sunday: no peak hour).


Water supply

- From Nhon Trach underground water plant: with capacity of 20,000m3/day & night.
+ Water using fee: 11,500 VND/m3 (excluding VAT)
- In addition, the I.P. can use the water supplied from Thien Tan water plant, with capacity of 200,000m3/day & night.


Telecommunication

The telecommunication services will be fully invested in the IP. The enterprises can register to connect easily and quickly.


Service of waste water system

 

 

- Waste water treatment plant with the total capacity of 3,000m3/day & night ( Phase 1 ).
- Standard level for effluent discharged into waste water system of the I.P.: according to QCVN 40:2011.
- Waste water treatment fee: 0.35 VND/m3 (excluding VAT)
- The volume of waste water equal to 80% of supplied water volume


Ong Keo General port

- The industrial park has a port which has a load capacity of 30,000 tons and services for enterprises in industrial zones and surrounding areas to facilitate the import and export of goods .
- Length of quay : 265 m (Able to receive a ship of 30,000 DWT or twice of 5.000 10,000 DWT at one time)

- Total area of construction planning : 18.97 ha , of which :
+ Warehouse : 18,720 m2
+ Maintenance Workshop : 1,008 m2
+ Yards : 105,085 m2
+ Roads :
- Road construction within the port area : 46,610 m2
- Road outside the port building area : 1,057 m2

 

+ The office and ancillary works : 5,545 m2
+ Green tree area : 11,655 m2

 

- The elevation of the design port : + 2.50 m (Hon Dau System)
+ 5.48 m (Hai Do System)