Infrastructure

System of inner traffic

- Inner traffic system under constructed.


Power supply

Supplied from the national grid of 22 KV.
+ Regular-time hour: 1,405 VND/Kwh
(From Monday to Saturday: 4h – 9h30;
11h30–17h; 20h – 22h; Sunday: 4h – 22h).
+ Low-time hour: 903 VND/Kwh
(From Monday to Sunday: 22h – 4h).
+ Peak-time hour: 2,556 VND/Kwh
(From Monday to Saturday: 9h30 – 11h30; 17h – 20h).


Water supply

Be supplied from water station with capacity of 22,000m3/ day-night (phase 1) and developed for demand of using water of residential area and industrial park.


Telecommunication

Communication system in IPs will be built completely to serve the production activities in the industrial park.
Currently, Ba Ria - Vung Tau province is considered one of the provinces with the best telecommunications system of Vietnam.


Waste water treatment system

 

 

Concentrated wastewater treatment plant meets the environmental regulations of Vietnam QCVN 24:2009 before being discharged to environment. Total capacity of the wastewater treatment station: 17,400m3/day-night. The first phase will be 2,000m3/day-night
Solid waste transfer station will be also constructed for solid waste collection in industrial park before sorting and processing.


Dat Do 1 residential area

Besides, Dat Do 1 Residential, adjacent to Dat Do 1 Ip., with area of 133 hectares will be invested to serve for the operation of industrial parks as well as socio-economic development of the local.